6-1 Owensboro, KY Proposals are requested from qualified and experienced firms only for the planning and design of Owensboro Centre, Kentucky's newest living and working environment. This scenic hundred-acre site will feature 500 housing units, shopping and public gardens. CADD capabilities are preferred. Cost of site-work construction not to exceed $3.2 million.
6-2 Linton, IN Green-Sullivan State Forest is inviting environmentally concerned firms with G.I.S. capabilities to submit proposals for the inventory and mapping of the park's 5,000 acres of wetlands. Client is Indiana Department of Natural Resources. This job is being re-bid after previous fee proposals exceeded the 1200 hour fee cap. CADD and image-simulation capabilities (photo-studio) are required. Please submit hours only. (State will reimburse the selected consultant at a standard rate of $74.00/hour.)
6-3 East Chicago, IN Barren Dunes Estates is seeking proposals from firms qualified in waterfront development and subdivision planning for the design and detailing of this fixed-income community on the southern shore of lake Michigan. Target consultant?s fee is $75,000, but BDE is interested in lower fee proposals from qualified firms.
6-4 Columbus, IN Three Shoppes at Faire Oakes Village, Inc. invites firms with experience in large-scale retail environments to submit fee proposals for the planning and detailing of open space and parking at Faire Oakes Village, a festival market with 54 extremely cute boutiques and a food court. Construction budget for all site-related costs has been estimated at $1,800,000. TSFOV, Inc. is seeking competitive bids.
6-5 Huntington, IN SWMIIT (Stop Walt-Mar In Its Tracks), Inc., is seeking environmental consulting services to assist in their efforts to prevent Walt-Mar International from development of its proposed Huntington wetlands site. A flat fee of $34,000 will be awarded to the firm that best demonstrates an environmental commitment and a proven track record in environmental assessment and planning.
6-6 West Lafayette, IN Mr. and Mrs. Thomas Ridgeway request qualified fee proposals for the planning and design of their new 4- acre residential property in the Capilano subdivision of West Lafayette. The Ridgeways enjoy entertaining guests and need an exterior environment that is eye-catching, unique and flexible. Mrs. Ridgeway is the Department Head of the new Environmental Planning Department at Purdue University, so their landscape must be both sustainable and environmentally friendly. They have budgeted a total of $225,000 for site development of their 1.8 million dollar home.
6-7 Attica, IN Rails to Trails of Warren County requests proposals for the planning and design of a 7.25 mile stretch of abandoned railroad right-of-way. Cost of construction is estimated at $20.00 per linear foot.
6-8 Granger, IN Hoelin-Wun Inc. is inviting qualified firms to submit fee proposals for the design of its new championship level 18-hole golf course. This course is to be an innovative, unique design superior to anything ever dreamed of by Pete Dye. Site design also includes parking for 150 cars. Site construction costs set at $250,000/hole.